來源:http://kwcwb.cn/ 發(fā)布時(shí)間:2022-06-07
鋁卷是我們經(jīng)常用到的一款材料,在很多領(lǐng)域都會(huì)看到它的身影。不管是工程建筑,還是設(shè)備包裝都離不開它。但在利用它施工時(shí)要注意的事項(xiàng)還是挺多的,下面來看看。
Aluminum coil is a kind of material that we often use, and it can be seen in many fields. It is indispensable for engineering construction and equipment packaging. However, there are still many matters needing attention when using it for construction. Let's take a look.
1、鋁卷外保溫施工前,按相關(guān)技術(shù)標(biāo)準(zhǔn)要求,制定節(jié)能保溫專項(xiàng)施工方案,完成施工人員的技術(shù)交底和技術(shù)培訓(xùn)。
1. Before the construction of aluminum coil external insulation, the special construction scheme for energy conservation and insulation shall be formulated according to the requirements of relevant technical standards, and the technical disclosure and professional technical training of construction personnel shall be completed.
2、施工應(yīng)按照批準(zhǔn)的施工圖設(shè)計(jì)文件和工程節(jié)能保溫專項(xiàng)施工方案進(jìn)行,并有的現(xiàn)場(chǎng)指導(dǎo),配合施工單位和現(xiàn)場(chǎng)施工。現(xiàn)場(chǎng)監(jiān)理要做好施工質(zhì)量控制。
2. The construction shall be carried out in accordance with the approved construction drawing design documents and the special construction scheme for energy conservation and insulation of the project, with professional on-site guidance and cooperation with the construction unit and on-site construction. The site supervisor shall control the construction quality.
3、材料入庫前必須按規(guī)格、數(shù)量、質(zhì)量等要求驗(yàn)收合格,并由專人保管。嚴(yán)禁露天堆放。幕墻隔熱鋁圈應(yīng)在架空堆放,以防受潮。
3. Before warehousing, the materials must be accepted according to the requirements of specification, quantity and quality, and kept by a specially assigned person. It is strictly prohibited to stack in the open air. The thermal insulation aluminum ring of curtain wall shall be stacked overhead to prevent moisture.
4、腳手架桿、水平桿與墻角的距離應(yīng)符合施工要求。
4. The distance between scaffold pole, horizontal pole and wall corner shall meet the construction requirements.
5、基墻應(yīng)堅(jiān)固、光滑,表面干燥,不得開裂、空鼓、松動(dòng)或堿化。
5. The foundation wall shall be firm and smooth, and the surface shall be dry without cracking, hollowing, loosening or alkalization.
6、水泥砂漿找平層的粘結(jié)強(qiáng)度、平整度、垂直度應(yīng)滿足普通抹灰工程的質(zhì)量要求。
6. The bonding strength, flatness and perpendicularity of the cement mortar leveling layer shall meet the quality requirements of ordinary plastering works.
7、當(dāng)基礎(chǔ)及施工環(huán)境溫度低于5℃時(shí),不得施工。5級(jí)及以上強(qiáng)風(fēng)、雨、雪天氣不得施工。
7. When the temperature of foundation and construction environment is lower than 5 ℃, no construction is allowed. No construction is allowed in strong wind, rain and snow of level 5 or above.
8、施工中和施工后應(yīng)采取有效措施,防止雨水沖刷和日曬,并及時(shí)準(zhǔn)備好保護(hù)層。
8. Effective measures shall be taken during and after construction to prevent rainwater scouring and sun exposure, and the protective layer shall be prepared in time.
9、施工過程中如遇驟雨,應(yīng)采取措施防止雨水沖刷墻面,冬季施工時(shí)應(yīng)按相關(guān)標(biāo)準(zhǔn)采取防凍措施。
9. In case of sudden rain during construction, measures shall be taken to prevent rainwater from scouring the wall. Anti freezing measures shall be taken according to relevant standards during winter construction.
10、施工期間,操作人員應(yīng)穿戴好個(gè)人防護(hù)用品,保護(hù)職業(yè)健康,注意施工。
10. During construction, operators shall wear personal protective equipment to protect occupational health and pay attention to construction.
11、施工材料應(yīng)送交有資質(zhì)的檢測(cè)機(jī)構(gòu)檢測(cè),檢測(cè)合格后方可使用;粘貼鋁卷時(shí)可采用粘貼法或點(diǎn)粘貼法,粘貼面積不能小于50%。
11. Construction materials shall be sent to a qualified testing agency for testing, and can be used only after passing the testing; The aluminum coil can be pasted by pasting method or point pasting method, and the pasting area shall not be less than 50%.
12、在保溫鋁卷上涂上粘合劑后,將保溫板的下端粘在底座上。
12. After the adhesive is applied on the insulation aluminum roll, the lower end of the insulation board is adhered to the base.
13、保溫鋁卷應(yīng)自下而上水平鋪設(shè),鋪設(shè)時(shí)應(yīng)做錨固。接縫應(yīng)自然緊密,板間間隙不應(yīng)大于2mm。當(dāng)接縫寬度為2mm時(shí),需要填充絕緣材料。
13. The thermal insulation aluminum coil shall be laid horizontally from bottom to top and anchored during laying. The joints shall be natural and tight, and the gap between plates shall not be greater than 2mm. When the joint width is 2mm, it needs to be filled with insulating material.
14、相鄰板應(yīng)齊平,板間高度差不大于1.5mm;凡能到達(dá)保溫鋁卷的穿墻管道和構(gòu)件,出口位置都需要用相同的材??料填充,然后防水密封。
14. Adjacent plates shall be flush, and the height difference between plates shall not be greater than 1.5mm; All through wall pipes and components that can reach the insulation aluminum coil shall use the same materials at the outlet?? Fill with water-proof material and then seal with water-proof material.
15、鋁卷生產(chǎn)廠家提醒您,如果施工過程中如發(fā)現(xiàn)面層脫落,應(yīng)及時(shí)用錨桿粘結(jié)或錨固,外裝飾面層應(yīng)及時(shí)施工。
15. The aluminum coil manufacturer reminds you that if the surface layer is found to fall off during construction, it should be bonded or anchored with anchor bolts in time, and the external decorative surface layer should be constructed in time.
此外鋁卷具有使用壽命長、不易損傷的優(yōu)點(diǎn),因此深受用戶的喜愛。若是使用時(shí)發(fā)現(xiàn)產(chǎn)品表面存在污漬,需要用大量的清水對(duì)產(chǎn)品表面進(jìn)行沖洗,將表層的污垢、灰塵等清洗干,后續(xù)清理的詳細(xì)信息就來關(guān)注我們網(wǎng)站kwcwb.cn咨詢了解吧!
In addition, aluminum coil has the advantages of long service life and not easy to be damaged, so it is deeply loved by users. If stains are found on the surface of the product during use, it is necessary to wash the product surface with a large amount of clean water to dry the dirt and dust on the surface. For details of subsequent cleaning, please pay attention to our website www.jndclyyxgs Www. 68mn!